Gas crack sealing machine is mainly operated with hand push + hand pouring tube, suitable for the sealing machine with smaller melt tank.
When first added in the bin or asphalt pouring glue to one-third of the lit burner hob (grilled by igniting gun can not be used directly to ignite the flame combustion chamber if there is a certain risk on LPG) adjusted to the optimum ignition flame after flame, then began to heat thermal oil inside the melt temperature by watching the thermometer shows at a glance. Soluble material time approximately 90 minutes. According to the melting temperature of the pouring material, adjust the flame size.
After dissolving the material for about 30 minutes to start the generator, turn on the power switch of the feeding tube is given feeding tube heating (about 40 minutes). In the material melts, the material tube temperature reached after working. No hand pouring tube driven irrigation sewing machine resorted to spout positive feed crack pouring; handheld pouring tube with the pouring tube alignment crack pouring process. In the course of adding materials to ensure the continuity of the work at any time. Asphalt pump discharge flow rate is adjustable.
Shanghai Doan Machinery Technology Co.,Ltd.was found in 2008,mainly engaged in R&D and production of road construction and high-end road maintenance equipment,the products and services have covered in more than 100 countries around the world,provide the One-Stop solutions for customers.
Welcome to contact with us to get more information about our products.