Project Planning of Crack sealing

Project Planning of Crack sealing
 As we all know, crack sealing machine can repair the road with saving labors and low costs. And cracks in the pavement are always load associated, the joint system does not have sufficient control of the movement. The cracks may be transverse, longitudinal, or angled, especially in flat corners.
 
Generally, crack sealing treatments will be applied when the width of the crack at its midpoint to widest, and it always complete the work in the spring, fall, or winter, which season the temperature is moderately cold weather conditions. During the project of crack sealing, the weather is not too cold or too wet. Since the width of the non-working crack does not vary significantly with the temperature, the application of the crack is applied at any time of the year when the weather conditions are appropriate.
 
Another factor is the traffic, if the crack filling by a hot applied sealed or filled, it is not necessary to control the traffic. However, it must be control the traffic during the application of the treatment , in order to protect the crack recover quickly and prevent tracking. Sand can be typically needed for cold applied systems to prevent tracking.
 
According to the different choices about the crack sealing machine, planning considerations will be different, for example, cold pour materials require different handling than hot pour. 
 